Traffic built up along the Lagos/Ibadan Expressway around Berger on Tuesday due to repair work being carried out at the Kara Bridge. The road serves as the main gateway into and outside Lagos and is plied by thousands of vehicles daily. A Daily Trust photojournalist reported a high influx of vehicles during a visit on Tuesday. The congestion is attributed to the ongoing bridge repair works.
Don't miss out on breaking stories and in-depth articles.