Power transmission has resumed after the Transmission Company of Nigeria (TCN) repaired a collapsed tower in Kebbi. TCN stated that its engineers worked round the clock to restore the damaged infrastructure within the shortest possible time while observing safety requirements. The restoration has brought back electricity transmission in the affected area.
Don't miss out on breaking stories and in-depth articles.