By Egufe Yafugborhi The water at Odidi struggles to flow. It sits, thick, black, and dead. For seven months, the 28-inch Trans-Forcados Pipeline at the Kantu-Odidi axis, Warri South-West LGA has bled crude and associated gas into the creeks. What was sighted February 19, 2026 as a single rupture has become a black tide that has swallowed over 216 communities ...
Don't miss out on breaking stories and in-depth articles.